PORTFOLIO

Honeycomb seals – projects performed

2021

facility turbine type scope of works
Kozienice PP 200MW Gland seals, 4 rings
Siekierki CHP Plant 125MW Balance piston seals / AK1+AK2, AK3, front gland / HP section, rear gland / HP section

2020 

facility turbine type scope of works
Łódź CHP Plant Gland seals, 6 rings
Kraków CHP Plant 13UK125 Over-shroud seals of HP section, stage 2-4 and IP section, stage 2-9
Żerań CHP Plant WT25 Curtis wheel seals, C1 and C2
Siekierki CHP Plant TK120 Over-shroud seals of  HP section, stage 2-11  and IP section, stage 2-13
Siekierki CHP Plant TC30 Gland seals, HP section, 3 circuits
Opole PP (GE Power) 18K370 Balance piston seals, 7 circuits
Dolna Odra PP 13K235 Interstage shaft seals
Confidential data WK100 Over-shroud seals of HP section, stage 1-4, gland seals/HP and IP section

2019

facility turbine type scope of works
Opole PP (GE Power) 18K370 Balance piston seals, HP section
Kostolac (GE Power) 18K370 Balance piston seals, HP section
GE Croatia 50MW Gland seals
Kutina (GE Croatia) 35MW Gland seals

2018

facility turbine type scope of works
GE Power 103JT Balance piston seals
GE Croatia 50MW Gland seals
Opole PP (GE Power) 18K370 Balance piston seals, HP section
Kraków CHP Plant 13UK125 Over-shroud seals of  HP section, stage 2-11  and IP section, stage 2-13
Siekierki CHP Plant TC30 Gland seals, HP section, 3 circuits

2017

facility turbine type scope of works
Confidential data WK-100 Over-shroud seals of HP section, stage 1-4
Gland seals, LP section.
GE Croatia 50MW Gland seals
GE Power 103JT Balance piston seals

2016

facility turbine type scope of works
Żerań CHP Plant,
TZ-1
WT-25-4 Curtis wheel seals, C1 and C2
Żerań CHP Plant,
TZ-3
WT-25-4 Curtis wheel seals, C1 and C2
Katowice CHP Plant TK-120/12 Over-shroud seals, HP section, stage 2-18, IP section, stage 1-4.

2015

facility turbine type scope of works
Siekierki CHP Plant, TZ-8 13UK125 Over-shroud seals, HP section, stage 2-11 and IP section, stage 2-13
Żerań CHP Plant,
TZ-5
WT-25-4 Curtis wheel seals, C1 and C2
Opole PP (Alstom) 18K370 Balance piston seals
Poznań CHP Plant 13UC105 Gland seals, HP section, 4 circuits

2014

facility turbine type scope of works
Żerań CHP Plant,
TZ-4
WT-25 Curtis wheel seals, C1 and C2
Siekierki CHP Plant, TG-2 TC-30 Curtis wheel seals, C1 and C2 plus 3 circuits of high pressure gland
Alstom 103JT Balance piston seals

2013

facility turbine type scope of works
Nevinnomyssk (Alstom) 101JT Balance piston seals

Other significant projects

2019

  • Major overhaul of the M2 transporter crane, engine room area, Siekierki CHP Plant (EC Siekierki).

2018

  • Regeneration of the bowls of Moeller’s valves.
  • Mechanical and electrical renovation of the transporter crane in the waste-water treatment plant, Siekierki CHP Plant (EC Siekierki).
  • Performing of works connected with relief chambers for the division plane of the WP turbine of the SST / 600 turbine.
  • Regeneration of the filter bed in the slag settling tank, PGNiG Termika.
  • Machining of three-way TZ3 turbine valves.

2017

  • Repair of minimum flow valves, PAK (Konin).
  • Repair of the crane of the sewage treatment plant, Siekierki CHP Plant (EC Siekierki)

2016

  • Modernisation of the RSH TZ9, Siekierki CHP Plant (EC Siekierki).
  • Machining of the subdivision plane of the TZ9 housing, Siekierki CHP Plant (EC Siekierki).
  • Manufacture of spare parts for TC-25 quick-closing valve.
  • Renovation combined with the revitalisation of three-way valve chamber material, PGNiG Termika.

2015

  • Overhaul of the intake valves of HP section heaters.
  • Restoration of the face of control valves and quick-closing parts of the IP section/13UK125 turbine, ZRE Katowice.
  • Legalisation of sealing surfaces of manholes Xa and Xb of the TZ7 turbine set, Enrem Połaniec.

2014

  • Repair and revitalisation of angle valves, PGNiG Termika.

2013

  • Modernization of shut-off valves for SP 13UK125 turbine, Ethos Energy.
  • Machining the seating of TK50 turbine bearing No. 1, Alstom.
  • Machining of seats for the TK50 control valves diffuser, ZRE Katowice.
  • Legalisation of TC30 TZ-1 and TZ-3 steering wheel notches, ZRE Katowice.
  • Legalisation of TC30 TZ-1 nozzle box seating, ZRE Katowice.

Our Clients

  • PGNiG Termika
  • Zakłady Remontowe Energetyki Katowice
  • GE & Alstom Energy
  • Ethos Energy
  • Bilfinger Industrial Services Polska
  • Enrem Połaniec
  • Grupa Obsługi Przemysłu BETA
  • PGE Górnictwo i Energetyka Konwencjonalna